Key Insights
Quick Facts
- Name: Port Canaveral Berth Expansion Project
- Location: Port Canaveral, Florida
- Client: Port Canaveral Authority
- Size: 1,309-foot-long berth
- Our Solution: Arcosa Lightweight provided lightweight aggregate to fill behind the sheet piles, allowing developers to extend the port into the water while reducing lateral pressures.
- Why Lightweight Works: Lightweight aggregate’s low density and high internal friction angle helped minimize lateral forces on the sheet piles, reducing material costs and enhancing stability.
Final Results
-
The new berth now accommodates the Mardi Gras, Carnival Cruise Line’s largest ship, and supports next-generation Oasis-class ships. The project was completed efficiently and on budget, thanks to Arcosa’s lightweight aggregate.
Key Quote
Context:
- Considerations: The use of lightweight aggregate reduced the need for heavier materials, cutting costs and allowing the design to accommodate larger vessels without compromising structural integrity.
- Lessons Learned: Lightweight aggregate offers a cost-efficient, stable solution for projects requiring the extension of land, particularly in maritime applications.
Contact Arcosa to learn how lightweight aggregate can enhance stability and cost-efficiency in your next large-scale construction project.
Lightweight Aggregate Creates New Land for Cruise Ship Terminal
Port Canaveral, one of the world’s busiest maritime operations, now operates an advanced docking berth capable of handling today’s larger cruise ships. To achieve this, Arcosa provided the lightweight aggregate needed to extend the port into the water, creating stable ground for the expanded infrastructure.
Jack Moore, Geotechnical Market Manager at Arcosa, explains, “Developers essentially created new land by extending the existing port into the water, using our lightweight aggregate to provide the necessary stability.”
Major Expansion
In 2012, Port Canaveral launched a $163-million campaign to improve and redevelop Cruise Terminal 3 (CT-3), which originally opened in 1983. A significant portion of this initiative included a $35-million rebuild of the existing wharf to accommodate today’s fleet of ultra-large cruise ships. The project began in 2018 with the demolition of an outdated, open-pile pier.
The new berth is a 1,309-foot-long facility designed for the Mardi Gras, the largest ship ever built for Carnival Cruise Line. The berth’s construction utilized expensive steel pipe and sheet piling. To ensure the project remained cost-effective, lightweight aggregate from Arcosa was used to fill behind the sheet piles.
“The low density and high internal friction angle of Arcosa’s lightweight aggregate played a crucial role in reducing lateral pressures on the sheet piles,” says Moore.
“This reduction allowed designers to decrease the gauge and length of the sheet piles, resulting in significant cost savings.”
Lightweight aggregate weighs about half as much as traditional fill materials like quarried stone. This advantage, combined with its high internal friction angle, reduced lateral forces by more than half, contributing to the stability of the structure.
“Lightweight aggregate’s low density and high friction angle make it an ideal choice for reducing lateral earth pressures and applied vertical stresses,” Moore adds.
Product Placement
On the jobsite, lightweight aggregate does not require special handling procedures. Crews easily placed the material using standard loaders, rollers, and plate compactors.
“Compaction is quicker and requires fewer passes compared to conventional fill,” explains Moore. “This allowed for faster fill placement and higher efficiency on-site.”
For this project, lightweight aggregate was delivered by both rail and truck. The material traveled roughly 600 miles from Livingston, Alabama, to the site.
“We used 550 railcars to deliver approximately 60,000 cubic yards of lightweight aggregate,” says Moore. “Everything was coordinated smoothly, ensuring that delivery and placement went off without a hitch.”
Successful Completion
The new berth at Port Canaveral Cruise Terminal #3 incorporates steel pipe and sheet piling bulkhead walls, a steel pipe pile tieback A-frame, and monopile and multi-pile shore and offshore mooring dolphins. It now accommodates next-generation Oasis-class cruise ships, which span over 1,300 feet and hold more than 6,000 passengers and 2,000 crew members.